Message boards : US Navy message board : prime grid challenge 2012
Author | Message |
---|---|
Yank Send message Joined: 18 Apr 06 Posts: 71 Credit: 1,752,514 RAC: 0 |
PrimeGrid's 2012 Challenge Series Cinco de Mayo Challenge 5 May 18:00 UTC – 10 May 18:00 UTC. This is a five day challenge. The work unit will be TRP LLR. Only those work units downloaded after 18:00 UTC time on 5 May and finished before 18:00 TDC time on 10 May will be given credits. Ten days and 16 hours to go.If not a signed up member for the Navy web site at http://www.mikesbawx.org/navyhow about coming by the site, sign-in and have a look around. Thanks Yank |
Message boards :
US Navy message board
: prime grid challenge 2012
©2024 University of Washington
https://www.bakerlab.org